Electrostatic application of TGIC powders are applied manually
in an environmental room that controls humidity at less than
50%.
Curing of these components
is accomplished in a 450ºF maximum temperature curing oven.
The oven has three load bar locations to permit proper curing
time that may vary 40-55 minutes (Curing times are dependent on
metal thickness).
Cooling of approximately 60
minutes is achieved by the three load bar stations between the
curing oven and the "lowerator" loading and unloading station.
Coating thickness is
checked prior to off-loading the steel components with a
thickness meter. If the proper thickness is not met, then
the steel components will go back to the oven where it is melted
down and begin the process again.
|